Quick answers
What is Sand/Morrum Mining Project?
Sand/Morrum Mining Project is an approved mining project in Mailwar, Mauranipur, Jhansi, Uttar Pradesh. The site covers 35 acres.
Who is building it?
The applicant is Ashu Bhati.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Sept 2023), as of 27 Nov 2026.
Where is it?
In Mailwar, Mauranipur, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh and a site of 35 acres.
When was it filed?
The application was filed on 6 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Sept 2023 |
| Application filed | 6 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashu Bhati |
| Land area | 35 acres (14.2 ha) |
| Project cost | ₹55 lakh |
| Village / locality | Mailwar |
| Taluk / tehsil | Mauranipur |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00828 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Sept 2023 (this page) | Environmental approval granted | 35 acres | ₹55 lakh |
| Early planning filed 20 Feb 2023 | Cleared for impact study | 35 acres | ₹55 lakh |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 35 acres, this one is larger than 84% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mailwar, Mauranipur, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining Project — cleared for impact study, 0 m away
- Proposed BPCL Retail Outlet on Jhansi to Chhatarpur Road (NH-39) in between Km… — forest land use approved, 12.1 km away
- Ordinary Soil Excavation — lapsed, 13.8 km away
- Building Stone or Khanda, Gitti, Boulder Mining Project — lapsed, 15 km away
- Sand/Morrum Mining from Sukhnai Riverbed — environmental approval granted, 16.4 km away
- Transfer of the EC for the Short Term Lease of Sand/Morum Mining Project at… — initial checks, 16.4 km away
- Transfer of the EC for the Short Term Lease of Sand/Morum Mining Project at… — cleared for impact study, 16.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 17.7 km away
More from Ashu Bhati in Jhansi
- Teharka Sand/Morrum Mining Project — environmental approval granted
- Teharka Sand/Morrum Mining Project — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.