Quick answers
What is Building Stone or Khanda, Gitti, Boulder Mining Project?
Building Stone or Khanda, Gitti, Boulder Mining Project is a lapsed mining project in Kanja, Mauranipur, Jhansi, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Anil Kumar Niranjan.
Has it been approved?
No. The application was lapsed on 25 Jun 2026, so it is no longer under consideration.
Where is it?
In Kanja, Mauranipur, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹69 lakh and a site of 2 acres.
When was it filed?
The application was filed on 29 Oct 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jun 2026 |
| Application filed | 29 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Anil Kumar Niranjan |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹69 lakh |
| Village / locality | Kanja |
| Taluk / tehsil | Mauranipur |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02616 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is smaller than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kanja, Mauranipur, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining From Sukhnai Riverbed — cleared for impact study, 6.2 km away
- Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at… — environmental approval granted, 6.2 km away
- Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at… — cleared for impact study, 6.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 7.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 8 km away
- Proposed BPCL Retail Outlet on Jhansi to Chhatarpur Road (NH-39) in between Km… — forest land use approved, 8.1 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 9 km away
- Sand/Morrum Mining from Sukhnai Riverbed — environmental approval granted, 9.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.