Quick answers
What is this project?
"Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Ramnagar Kauhan, Gata No.- 144, 40, 36, 32, 68, 5 (Khand No.- RK1A), lease area- 34.81 Ha.,Tehsil- Sadar, District- Fatehpur, Uttar Pradesh Developed by Smt. Rajni Jaiswal is an approved mining project in Ramnagar Kauhan, Fatehpur, Uttar Pradesh. The site covers 86 acres.
Who is building it?
The applicant is Rajni Jaiswal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Sept 2023), as of 27 Nov 2026.
Where is it?
In Ramnagar Kauhan, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.8 crore and a site of 86 acres.
When was it filed?
The application was filed on 25 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Sept 2023 |
| Application filed | 25 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajni Jaiswal |
| Land area | 86 acres (34.8 ha) |
| Project cost | ₹3.8 crore |
| Village / locality | Ramnagar Kauhan |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00886 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Sept 2023 (this page) | Environmental approval granted | 86 acres | ₹3.8 crore |
| Early planning filed 10 May 2023 | Cleared for impact study | 86 acres | ₹3.8 crore |
In context
62 applications in Fatehpur since January 2022 are in the same category (Mining): 42 approved, 18 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 86 acres, this one is larger than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 172 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Ramnagar Kauhan, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Ramnagar Kauhan,… — cleared for impact study, 0 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 50 m away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 50 m away
- Sand/Morrum Mining From Yamuna Riverbed — more information requested, 2.8 km away
- Proposed "Morrum" Project at Khand No.- 04, Gata No.- 256, 281, 282, 283, 284,… — under environmental review, 7.6 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 9.9 km away
- Mining of Minor Mineral (Sand/ Morrum) — environmental approval granted, 10 km away
- Mining of Minor Mineral (Sand/ Morrum) — cleared for impact study, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.