Quick answers
What is this project?
Proposed "Morrum" Project at Khand No.- 04, Gata No.- 256, 281, 282, 283, 284, 300, 301, 315, 316, 330, 335, 347, 354, 355, 364,365, 373, 374, 387, 388 Ka Bhag, Village- Sevramau Ahatmali, Tehsil- Fatehpur, District- Fatehpur, U.P. (Applied Area- 25.00 ha.), Shri Udaybhan Tiwari S/o Shri Prabodh Tiwari is a proposed mining project in Sewramau, Fatehpur, Uttar Pradesh. The site covers 61.8 acres.
Who is building it?
The applicant is Udaybhan Tiwari.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Sewramau, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh and a site of 61.8 acres.
When was it filed?
The application was filed on 17 Nov 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 17 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Udaybhan Tiwari |
| Land area | 61.8 acres (25 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Sewramau |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07555 |
In context
62 applications in Fatehpur since January 2022 are in the same category (Mining): 42 approved, 18 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 61.8 acres, this one is smaller than 58% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Sewramau, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Riverbed Sand/Morrum Mining from River bed of Yamuna River… — under environmental review, 5.6 km away
- Proposed project of Riverbed Sand/Morrum Mining from River bed of Yamuna River… — environmental approval granted, 5.6 km away
- Proposed project of Riverbed Sand/Morrum Mining from River bed of Yamuna River… — cleared for impact study, 5.6 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 7.5 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 7.5 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Ramnagar Kauhan,… — environmental approval granted, 7.6 km away
- "Sand/Morrum Mine" from Riverbed of Yamuna River, Village- Ramnagar Kauhan,… — cleared for impact study, 7.6 km away
- Sand/Morrum mining having lease area 10.958 ha along River Yamuna in Gata No-… — under environmental review, 7.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.