Quick answers
What is this project?
Proposed Project of Building stone Sand Stone Mine at Gata No 703 Sl. No. 23, Area 1.01 ha is a proposed mining project in Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh. The site covers 260.7 acres.
Who is building it?
The applicant is Radhika Devi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Nov 2023), as of 27 Nov 2026.
Where is it?
In Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹47 lakh and a site of 260.7 acres.
When was it filed?
The application was filed on 6 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of Building stone Sand Stone Mine at Gata No 703 Sl. No. 23, Area 1.01 ha
Project details
| Official title | Proposed Project of Building stone Sand Stone Mine at Gata No 703 Sl. No. 23, Area 1.01 ha in Village- Bhagautidei, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh |
|---|---|
| Status | Cleared for impact study |
| Status since | 6 Nov 2023 |
| Application filed | 6 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Radhika Devi |
| Land area | 260.7 acres (105.5 ha) |
| Project cost | ₹47 lakh |
| Village / locality | Bhagwatidei |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00904 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Dec 2025 | Environmental approval granted | 260.7 acres | ₹47 lakh |
| Early planning filed 6 Nov 2023 (this page) | Cleared for impact study | 260.7 acres | ₹47 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 260.7 acres, this one is larger than 100% of them.
16 other mining leases have applied within 500 m of this site; together with this one they cover 315.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 91 mining leases have applied within 5 km.
Where it is
Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Building stone Sand Stone Mine at Gata No 703 Sl. No. 23,… — environmental approval granted, 0 m away
- Building Stone (Sand stone) Mining Project — environmental approval granted, 0 m away
- Proposed Project of Buiding Stone Sandstone Gitti, Boulder Mine at Gata No.… — environmental approval granted, 50 m away
- Proposed Project of Buiding Stone Sandstone Gitti, Boulder Mine at Gata No.… — cleared for impact study, 50 m away
- "Sand Stone (Khanda, Gitty, Boulders) Mining Project" at Araji No. 703 Mining… — lapsed, 100 m away
- Building Stone Sand Stone Mine — environmental approval granted, 150 m away
- Building Stone Sand Stone Mine — cleared for impact study, 150 m away
- Building Stone (Sand stone) — lapsed, 150 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.