Quick answers
What is this project?
Proposed Project of Buiding Stone Sandstone Gitti, Boulder Mine at Gata No. 703 (Area code 2128770450), Area 1.01 ha is an approved mining project in Muni Dih, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Poonam Kushwaha.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Jan 2026), as of 27 Nov 2026.
Where is it?
In Muni Dih, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 3 Dec 2025.
Project details
| Official title | Proposed Project of Buiding Stone Sandstone Gitti, Boulder Mine at Gata No. 703 (Area code 2128770450), Area 1.01 ha in Village- Bhagauti Dei, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh of Smt Poonam Kushwaha |
|---|---|
| Status | Environmental approval granted |
| Status since | 31 Jan 2026 |
| Application filed | 3 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Poonam Kushwaha |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Muni Dih |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02715 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Dec 2025 (this page) | Environmental approval granted | 2.5 acres | ₹1.4 crore |
| Early planning filed 30 Nov 2024 | Cleared for impact study | 2.5 acres | ₹1.4 crore |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.
18 other mining leases have applied within 500 m of this site; together with this one they cover 320.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 91 mining leases have applied within 5 km.
Where it is
Muni Dih, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Buiding Stone Sandstone Gitti, Boulder Mine at Gata No.… — cleared for impact study, 0 m away
- "Sand Stone (Khanda, Gitty, Boulders) Mining Project" at Araji No. 703 Mining… — lapsed, 50 m away
- Proposed Project of Building stone Sand Stone Mine at Gata No 703 Sl. No. 23,… — environmental approval granted, 50 m away
- Proposed Project of Building stone Sand Stone Mine at Gata No 703 Sl. No. 23,… — cleared for impact study, 50 m away
- Building Stone (Sand stone) Mining Project — environmental approval granted, 50 m away
- Building Stone (Sand stone) — lapsed, 100 m away
- Building stone as Sand stone Gitty/Boulder/Patiya Mining at Gata No. - 705,… — environmental approval granted, 100 m away
- Building stone as Sand stone Gitty/Boulder/Patiya Mining at Gata No. - 705,… — cleared for impact study, 100 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.