Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 13 Dec 2023 |
| Application filed | 13 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rinku Singh |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹9 lakh |
| Village / locality | Malhapur |
| Taluk / tehsil | Auraiya |
| District | Auraiya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00954 |
In context
26 applications in Auraiya since January 2022 are in the same category (Mining): 17 approved, 9 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.7 acres, this one is smaller than 69% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Malhapur, Auraiya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected forest land Proposed for Approach Road for Bridge Over… — forest land use approved, 2.2 km away
- Proposed Protected Forest Land to Be Diverted for Widening and Strengthening… — lapsed, 2.3 km away
- Proposed residential and non-residential buildings in Reserve Police Line,… — environmental approval granted, 2.6 km away
- "Ordinary Soil Excavation Project" at Gata No.- 280, 286, Village- Sherpur… — environmental approval granted, 3.8 km away
- "Ordinary Soil Mining" Project at Gata No.- 154क, 147, 148, 140ख, Village-… — initial checks, 4.9 km away
- "Ordinary Earth Mining" Project at Gata No.- 210, Village- Sikhola, Tehsil-… — environmental approval granted, 5.2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 5.4 km away
- "Ordinary Earth Mining" Project at Gata No.- 279, Village- Chirhuliya, Tehsil-… — environmental approval granted, 6 km away
More from Rinku Singh in Auraiya
- Ordinary Soil Mining Project At Gata No.- 577, Village- Padariya,… — environmental approval granted
- Ordinary Earth Mining — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.