Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 May 2026 |
| Application filed | 16 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Up State Bridge Corporation Limited |
| Land area | 2.4 acres (1 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹163.9 crore |
| Village / locality | Umar Sana |
| Taluk / tehsil | Auraiya |
| District | Auraiya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07164 |
In context
7 applications in Auraiya since January 2022 are in the same category (Roads & highways): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Umar Sana, Auraiya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to Be Diverted for Widening and Strengthening… — lapsed, 1.5 km away
- "Ordinary Soil Excavation Project" at Gata No.- 64, 100, Village- Malehpur,… — environmental approval granted, 2.2 km away
- Proposed residential and non-residential buildings in Reserve Police Line,… — environmental approval granted, 4.8 km away
- "Ordinary Soil Excavation Project" at Gata No.- 280, 286, Village- Sherpur… — environmental approval granted, 5.8 km away
- "Ordinary Earth Mining" Project at Gata No.- 279, Village- Chirhuliya, Tehsil-… — environmental approval granted, 6.6 km away
- 37 Court rooms for Integrated Court Complex — environmental approval granted, 6.7 km away
- "Ordinary Soil Mining" Project at Gata No.- 154क, 147, 148, 140ख, Village-… — initial checks, 7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 7.2 km away
All 17 Up State Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.