Quick answers
What is Building Stone, Khanda & Gitti, Boulder Mining Project?
Building Stone, Khanda & Gitti, Boulder Mining Project is an approved mining project in Utiyan, Mahoba, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Shri Bhanu Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Jul 2023), as of 27 Nov 2026.
Where is it?
In Utiyan, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 crore and a site of 3 acres.
When was it filed?
The application was filed on 1 Jul 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Building Stone, Khanda & Gitti, Boulder Mining Project
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Jul 2023 |
| Application filed | 1 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Bhanu Gupta |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹2 crore |
| Village / locality | Utiyan |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01110 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Aug 2023 | Environmental approval granted | 3 acres | ₹80 lakh |
| New project filed 1 Jul 2023 (this page) | Environmental approval granted | 3 acres | ₹2 crore |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 32.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 42 mining leases have applied within 5 km.
Where it is
Utiyan, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone, Granite, Khanda, Gitti & Boulder Mining Project — environmental approval granted, 150 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 250 m away
- Building Stone, Khanda & Gitti, Boulder Mining Project — environmental approval granted, 250 m away
- Building Stone, Khanda & Gitti, Boulder Mining Project — environmental approval granted, 250 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 300 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 300 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 450 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 450 m away
More from Shri Bhanu Gupta in Mahoba
- Building Stone, Khanda & Gitti, Boulder Mining Project — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.