Quick answers
What is this project?
"Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 19 (Khand No.- 02), Village- Ganj, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area : 3.80 ha.) Prop.- Shri Yajur Bhardwaj S/o Shri Somesh Bhardwaj is an approved mining project in Ganj, Mahoba, Uttar Pradesh. The site covers 9.4 acres.
Who is building it?
The applicant is Yajur Bhardwaj.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 May 2025), as of 27 Nov 2026.
Where is it?
In Ganj, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹74 lakh and a site of 9.4 acres.
When was it filed?
The application was filed on 25 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 May 2025 |
| Application filed | 25 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Yajur Bhardwaj |
| Land area | 9.4 acres (3.8 ha) |
| Project cost | ₹74 lakh |
| Village / locality | Ganj |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01546 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 25 Jan 2025 (this page) | Environmental approval granted | 9.4 acres | ₹74 lakh |
| Early planning filed 17 Jan 2024 | Cleared for impact study | 9.4 acres | ₹74 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.4 acres, this one is larger than 93% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 32.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 40 mining leases have applied within 5 km.
Where it is
Ganj, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 0 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 150 m away
- Granite and Dolostone Ballast Gitti Mining Project — initial checks, 150 m away
- Granite and Dolostone Ballast Gitti Mining Project — under environmental review, 150 m away
- Building Stone, Khanda & Gitti, Boulder Mining Project — environmental approval granted, 250 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 300 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 300 m away
- Building Stone, Khanda & Gitti, Boulder Mining Project — environmental approval granted, 300 m away
More from Yajur Bhardwaj in Mahoba
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.