Project details
| Official title | PROPOSED INTEGRATED WEAK NITRIC ACID (WNA) AND AMMONIUM NITRATE (AN) MANUFACTURING PLANT AT VILLAGE-KISHURHAI, TEHSIL-SADAR, DISTRICT-SHAHJAHANPUR, UTTAR PRADESH BY M/s KRISHAK BHARATI COOPERATIVE LIMITED (KRIBHCO) |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 Nov 2023 |
| Application filed | 13 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Krishak Bharati Cooperative Limited |
| Land area | 26.3 acres (10.6 ha) |
| Project cost | ₹580 crore |
| Village / locality | Kishurahai |
| Taluk / tehsil | Shahjahanpur |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01121 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Oct 2023 (this page) | Environmental approval granted | 26.3 acres | ₹580 crore |
| Early planning filed 30 Jan 2023 | Cleared for impact study | 26.3 acres | ₹580 crore |
In context
29 applications in Shahjahanpur since January 2022 are in the same category (Industry): 25 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 26.3 acres, this one is smaller than 59% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kishurahai, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED INTEGRATED WEAK NITRIC ACID (WNA) AND AMMONIUM NITRATE (AN)… — cleared for impact study, 0 m away
- Expansion of Ammonia and Urea Production — cleared for impact study, 1.1 km away
- Expansion of Ammonia and Urea Production — cleared for impact study, 1.1 km away
- ProposedProtected Forest Land to be diverted for Laying of Gas Pipe Line along… — in-principle approval, conditions pending, 2.1 km away
- Proposed manufacturing unit of Formaldehyde (400 TPD) Urea Formaldehyde Resin… — cleared for impact study, 3.6 km away
- Ajijpur Jignera Soil Mining Project — environmental approval granted, 3.8 km away
- Proposed Manufacturing of Phenol Formaldehyde (PF) Resin – 5000 TPA Melamine… — cleared for impact study, 3.8 km away
- Proposed Manufacturing of Phenol Formaldehyde (PF) Resin – 5000 TPA Melamine… — environmental approval granted, 3.8 km away
All 3 Krishak Bharati Cooperative projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.