Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Aug 2023 |
| Application filed | 12 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jaheer Khan |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹67 lakh |
| Village / locality | Gonda |
| Taluk / tehsil | Karwi |
| District | Chitrakoot |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01183 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Aug 2023 (this page) | Environmental approval granted | 2 acres | ₹67 lakh |
| Early planning filed 22 Jan 2023 | Cleared for impact study | 2 acres | ₹67 lakh |
In context
116 applications in Chitrakoot since January 2022 are in the same category (Mining): 89 approved, 23 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is smaller than 100% of them.
14 other mining leases have applied within 500 m of this site; together with this one they cover 64.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 36 mining leases have applied within 5 km.
Where it is
Gonda, Karwi, Chitrakoot, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to UPEIDA Plans a 15-Kilometre Chitrakoot Link Expressway in Uttar Pradesh (7 km away).
Other projects nearby
- Proposed "Granite Gitti, Khanda / Boulders" Project at Gata No.- 1078 / 19,… — cleared for impact study, 0 m away
- Proposed Project of Granite Gitti, Khanda / Boulder And Pahadi Red Morrum Mine… — under environmental review, 50 m away
- Proposed Project of Granite Gitti, Khanda / Boulder And Pahadi Red Morrum Mine… — cleared for impact study, 50 m away
- "Building Stone (Granite Khanda / Gitti / Boulder)" Project at Gata No.- 1078… — environmental approval granted, 150 m away
- "Building Stone (Granite Khanda / Gitti / Boulder)" Project at Gata No.- 1078… — cleared for impact study, 150 m away
- "Granite Gitti, Khanda / Boulders" Project at Gata No./ Khand No.- 1078 / 18,… — environmental approval granted, 150 m away
- "Granite Gitti, Khanda / Boulders" Project at Gata No./ Khand No.- 1078 / 18,… — cleared for impact study, 150 m away
- Gonda Granite (Khanda, Gitty, Boulder) Deposit Mining Project — environmental approval granted, 150 m away
More from Jaheer Khan in Chitrakoot
- Proposed Project of Granite Gitti, Khanda / Boulder And Pahadi Red Morrum Mine… — under environmental review
- Proposed Project of Granite Gitti, Khanda / Boulder And Pahadi Red Morrum Mine… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.