What is Developing? Open the mapMap

Cleared for impact studyMining · Jalaun, Uttar Pradesh

Riverbed Sand/Morrum Mining Project having lease area 6.870 ha (16.99 acre) along River Betwa in Gata No.208, Khand No -01

Riverbed Sand/Morrum Mining Project having lease area 6.870 ha (16.99 acre) along River Betwa in Gata No.208, Khand No -01 is a proposed mining project in Karthara, Orai, Jalaun, Uttar Pradesh. The site covers 17 acres. Its stated project cost is ₹75 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 22 Dec 2023).

See it on the live map All projects in Jalaun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Riverbed Sand/Morrum Mining Project having lease area 6.870 ha (16.99 acre) along River Betwa in Gata No.208, Khand No -01 is a proposed mining project in Karthara, Orai, Jalaun, Uttar Pradesh. The site covers 17 acres.

Who is building it?

The applicant is Vinod Rai.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 22 Dec 2023), as of 27 Nov 2026.

Where is it?

In Karthara, Orai, Jalaun, Uttar Pradesh.

How big is it?

It has a stated cost of ₹75 lakh and a site of 17 acres.

When was it filed?

The application was filed on 22 Dec 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Riverbed Sand/Morrum Mining Project having lease area 6.870 ha (16.99 acre) along River…

Project details

Official titleRiverbed Sand/Morrum Mining Project having lease area 6.870 ha (16.99 acre) along River Betwa in Gata No.208, Khand No -01 at Village –Karthara, Tehsil- Orai, District- Jalaun, U. P.
StatusCleared for impact study
Status since22 Dec 2023
Application filed22 Dec 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVinod Rai
Land area17 acres (6.9 ha)
Project cost₹75 lakh
Village / localityKarthara
Taluk / tehsilOrai
DistrictJalaun
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01252

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 31 Oct 2025Environmental approval granted17 acres₹75 lakh
Early planning filed 22 Dec 2023 (this page)Cleared for impact study17 acres₹75 lakh

In context

149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 17 acres, this one is smaller than 93% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Karthara, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vinod Rai in Jalaun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.