Quick answers
What is this project?
Ordinary Earth Mining Project" Gata No. 221, 354, 418, 431, 432, 433 Village- Muzaffarpur, Tehsil- Sambhal, District- Sambhal (U.P.) (Lease Area: 3.448Ha.) is an approved mining project in Chaptiya Ki Mandayan, Sambhal, Uttar Pradesh. The site covers 24.7 acres.
Who is building it?
The applicant is Shubham.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Sept 2023), as of 27 Nov 2026.
Where is it?
In Chaptiya Ki Mandayan, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹47 lakh and a site of 24.7 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Sept 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shubham |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹47 lakh |
| Village / locality | Chaptiya Ki Mandayan |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01281 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 24.7 acres, this one is larger than 94% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Chaptiya Ki Mandayan, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retail Outlet MS/HSD Petrol/Diesel Pump BPCL Ltd. Bareilly. Protected land is… — forest land use approved, 1.8 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 2.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 3.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 3.9 km away
- Proposed "Ordinary Soil Mining Project" at Gata 38, 122, 125, 76, 156, 157,… — under environmental review, 5 km away
- "Ordinary Soil Mining" Project at Gata No.- 191, 215, 217, 218, 220, 221, 222,… — initial checks, 5.2 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 5.7 km away
- Proposed Protected Forest Land to be diverted for Ex-post Facto Approval… — more information requested, 6.7 km away
More from Shubham in Sambhal
- Ordinary Earthmining at Gatano.-636,147,603,601,602,637,588 — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.