Quick answers
What is this project?
Proposed Protected Forest Land to be diverted for Ex-post Facto Approval Entry/Exit approach to M/s Nayara Energy Limited formerly Essar Oil Limited Retail outlet on Sambhal-Hasanpur Road (SH-51) in Km 91 RHS at Khasra No.507 khatauni no.212, Village-Ruknuddin Sarai Sambhal, Tehsil-Sambhal & District:-Sambhal (Uttar Pradesh) is a proposed fuel station in Ruknuddin Sarai, Sambhal, Uttar Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is M/S Nayara Energy Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ruknuddin Sarai, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.3 acres and 420 m² of forest land.
When was it filed?
The application was filed on 22 Jun 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 22 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 1,200 m² |
| Forest land | 420 m² |
| Project cost | ₹60 lakh |
| Village / locality | Ruknuddin Sarai |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06340 |
In context
26 applications in Sambhal since January 2022 are in the same category (Fuel stations): 15 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.3 acres, this one is smaller than 100% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ruknuddin Sarai, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For… — forest land use approved, 600 m away
- M/S IOCL Ltd Moradabad Protected Land is required to be diverted (FCA 1980 For… — lapsed, 600 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 2.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 3.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 3.4 km away
- Retail Outlet MS/HSD Petrol/Diesel Pump BPCL Ltd. Bareilly. Protected land is… — forest land use approved, 4.9 km away
- Protected Forest Land Proposed For Diversion For (FCA 1980 Non forestry… — lapsed, 6.2 km away
- Ordinary Earth Mining Project" Gata No. 221, 354, 418, 431, 432, 433 Village-… — environmental approval granted, 6.7 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.