Quick answers
What is Khandas-Boulder /Gitti-Ballast Mining Project?
Khandas-Boulder /Gitti-Ballast Mining Project is an approved mining project in Dunara, Jhansi, Uttar Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Shri Mukul Yadav.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Jun 2023), as of 27 Nov 2026.
Where is it?
In Dunara, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 19 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Jun 2023 |
| Application filed | 19 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Mukul Yadav |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Dunara |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01313 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 66% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 34.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 23 mining leases have applied within 5 km.
Where it is
Dunara, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 100 m away
- Area: 1.052 Ha Khanda- Boulder/ Gitti-Ballast Mining Project At Gata-22, Khand… — environmental approval granted, 200 m away
- Building Stone (Granite) or Khanda, Gitty, Boulder, Ballast Mining Project — environmental approval granted, 200 m away
- Building Stone (Granite) or Khanda, Gitty, Boulder, Ballast Mining Project — cleared for impact study, 200 m away
- Proposed Project of Building Stone (Granite) Khanda, Gitti, Boulder, Ballast… — cleared for impact study, 300 m away
- Building Stone (Granite) or Khanda, Gitti, Boulder, Ballast Mining Project — cleared for impact study, 350 m away
- Building Stone or Khanda, Boulder, Gitti, Ballast Mining Project — cleared for impact study, 400 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — under environmental review, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.