Project details
| Official title | Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD along with Co gen power plant expansion from 6.0 MW to 21 MW within existing premises at Village- Bhandoria, P.O.- Aurangabad, District- Bulandshahr (U.P.) by M/s Anamika Sugar Mills Pvt Ltd (A Unit of Shree Renuka Sugars Limited) |
|---|---|
| Status | Environmental approval granted |
| Status since | 13 Nov 2024 |
| Application filed | 2 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Anamika Sugar Mills Private Limited |
| Land area | 133.4 acres (54 ha) |
| Project cost | ₹283 crore |
| Village / locality | Bhandauria |
| Taluk / tehsil | Bulandshahr |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01422 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 2 Sept 2024 (this page) | Environmental approval granted | 133.4 acres | ₹283 crore |
| Early planning filed 29 Jan 2024 | Cleared for impact study | 133.4 acres | ₹283 crore |
In context
10 applications in Bulandshahr since January 2022 are in the same category (Industry): 6 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 133.4 acres, this one is larger than 80% of them.
Where it is
Bhandauria, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD — cleared for impact study, 0 m away
- Common Bio Medical Waste Treatment Facility — under environmental review, 8.6 km away
- Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas… — lapsed, 13.1 km away
- Improvement of Existing SH-65 From Km 0+000 to Km 49+624 — lapsed, 13.3 km away
- Dfcc Edd-1 Bulandshahar — more information requested, 14.2 km away
- Jewar Airport to Ganga Expressway via Bulandshahr Link Expressway" in the… — cleared for impact study, 16 km away
- Proposed Group Housing "Golden Nest" At Plot No- CP-12 Yamuna Puram… — environmental approval granted, 16.6 km away
- लोक निर्माण विभाग ,प्रांतीय डिवीजन ,बुलंदशहर द्वारा लोक निर्माण अनुभाग-1… — more information requested, 16.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.