What is Developing? Open the mapMap

Cleared for impact studyIndustry · Bulandshahr, Uttar Pradesh

Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD

Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD is a proposed industrial project in Bhandauria, Bulandshahr, Uttar Pradesh. The site covers 133.4 acres. Its stated project cost is ₹283 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Feb 2024).

See it on the live map All projects in Bulandshahr

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD

Project details

Official titleProposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD along with Co gen power plant expansion from 6.0 MW to 21 MW within existing premises at Village- Bhandoria, P.O.- Aurangabad, District- Bulandshahr (U.P.) by M/s Anamika Sugar Mills Pvt Ltd (A Unit of Shree Renuka Sugars Limited)
StatusCleared for impact study
Status since17 Feb 2024
Application filed29 Jan 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAnamika Sugar Mills Private Limited
Land area133.4 acres (54 ha)
Project cost₹283 crore
Village / localityBhandauria
Taluk / tehsilBulandshahr
DistrictBulandshahr
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02479

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 2 Sept 2024Environmental approval granted133.4 acres₹283 crore
Early planning filed 29 Jan 2024 (this page)Cleared for impact study133.4 acres₹283 crore

In context

10 applications in Bulandshahr since January 2022 are in the same category (Industry): 6 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 133.4 acres, this one is larger than 80% of them.

Where it is

Bhandauria, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.