One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Group Housing Project "Gaur NYC Residences" at Plot No. GH-6, Sector-3,…
Project details
| Official title | Construction of proposed Group Housing Project "Gaur NYC Residences" at Plot No. GH-6, Sector-3, Kingwood Enclave NH - 24, Wave City, Ghaziabad (U.P.) by M/s Gaursons Hi-Tech Infrastructure Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 17 Feb 2024 |
| Application filed | 19 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Gaursons Hi-Tech Infrastructure Private Limited |
| Use | Residential |
| Land area | 11.8 acres (4.8 ha) |
| Built-up area | 3,46,087 m² (37,25,246 sq ft) |
| Plot area | 47,736 m² (5,13,826 sq ft) |
| Project cost | ₹1,265 crore |
| Village / locality | Naiphal |
| Taluk / tehsil | Ghaziabad |
| District | Ghaziabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01477 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Mar 2024 | Environmental approval granted | 11.8 acres | ₹1,265 crore |
| Early planning filed 19 Jan 2024 (this page) | Cleared for impact study | 11.8 acres | ₹1,265 crore |
In context
154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.8 acres, this one is larger than 82% of them.
48 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naiphal, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Group Housing Project "Gaur NYC Residences" at Plot No. GH-6,… — environmental approval granted, 0 m away
- Proposed Group Housing Project "Gaur Manhattan" at Plot No. GH-6, Sector-3,… — cleared for impact study, 0 m away
- Proposed Commercial Project at Commercial Plot No. 5, Springwood Enclave,… — environmental approval granted, 400 m away
- Proposed Group Housing "SKA IMPERIA" at Plot No. GH-04, Springwood Enclave,… — environmental approval granted, 550 m away
- Proposed Group Housing "SKA IMPERIA" at Plot No. GH-04, Springwood Enclave,… — environmental approval granted, 550 m away
- Proposed Group Housing "SKA IMPERIA" at Plot No. GH-04, Springwood Enclave,… — environmental approval granted, 550 m away
- Proposed Residential Group Housing Project at Plot No. GH-04, Sector-5, Aditya… — environmental approval granted, 1.1 km away
- Proposed Residential Group Housing Project at Plot No. GH-04, Sector-5, Aditya… — cleared for impact study, 1.1 km away
More from Gaursons Hi-Tech Infrastructure Private Limited in Ghaziabad
- Proposed Group Housing Project "Gaur Manhattan" at Plot No. GH-6, Sector-3,… — cleared for impact study
All 3 Gaursons Hi-Tech Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.