What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Ghaziabad, Uttar Pradesh

Proposed Group Housing "SKA IMPERIA" at Plot No. GH-04, Springwood Enclave, Sector-4, Wave City, Tehsil & District- Ghaziabad, Uttar Pradesh by M/s JRS Buildcon LLP.

Proposed Group Housing "SKA IMPERIA" at Plot No. GH-04, Springwood Enclave, Sector-4, Wave City, Tehsil & District- Ghaziabad, Uttar Pradesh by M/s JRS Buildcon LLP is an approved residential project in Bayana, Ghaziabad, Uttar Pradesh. It plans 151 units of up to 31 floors on 1.5 acres. Its stated project cost is ₹65 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 May 2025).

See it on the live map All projects in Ghaziabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Group Housing "SKA IMPERIA" at Plot No. GH-04, Springwood Enclave, Sector-4,…

Project details

StatusEnvironmental approval granted
Status since19 May 2025
Application filed18 Feb 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantJRS Buildcon LLP
UseResidential
Units151
Floors (tallest)31
Basements2
Height120 m
Parking spaces260
Land area1.5 acres (0.6 ha)
Built-up area40,277 m² (4,33,538 sq ft)
Plot area5,874 m² (63,227 sq ft)
Project cost₹65 crore
Village / localityBayana
Taluk / tehsilGhaziabad
DistrictGhaziabad
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02583

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 7 Apr 2026Environmental approval granted1.5 acres₹65 crore
Other filed 7 Apr 2026Environmental approval granted1.5 acres₹65 crore
New project filed 18 Feb 2025 (this page)Environmental approval granted1.5 acres₹65 crore

In context

154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is smaller than 93% of them.

47 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bayana, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 JRS Buildcon projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.