Environmental approval grantedBuildings & townships · Hapur, Uttar Pradesh

Group Housing Project at Plot K-2(2), Block-K, Anand Vihar Yojana, Hapur, Uttar Pradesh

Group Housing Project at Plot K-2(2), Block-K, Anand Vihar Yojana, Hapur, Uttar Pradesh is an approved residential project in Hapur, Uttar Pradesh. It plans 4 towers of up to 11 floors on 2.4 acres. Its stated project cost is ₹100 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 Feb 2025).

See it on the live map All projects in Hapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Group Housing Project at Plot K-2(2), Block-K, Anand Vihar Yojana, Hapur, Uttar Pradesh is an approved residential project in Hapur, Uttar Pradesh. It plans 4 towers of up to 11 floors on 2.4 acres.

Who is building it?

The applicant is M & M Protech private limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 20 Feb 2025), as of 27 Nov 2026.

Where is it?

In Hapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹100 crore and a site of 2.4 acres.

When was it filed?

The application was filed on 9 Nov 2024.

Project details

StatusEnvironmental approval granted
Status since20 Feb 2025
Application filed9 Nov 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantM & M Protech private limited
UseResidential
Towers4
Floors (tallest)11
Basements2
Height40 m
Parking spaces288
Land area2.4 acres (1 ha)
Built-up area51,314 m² (5,52,339 sq ft)
Plot area9,607 m² (1,03,409 sq ft)
Project cost₹100 crore
Village / localityHapur
Taluk / tehsilHapur
DistrictHapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01638

In context

17 applications in Hapur since January 2022 are in the same category (Buildings & townships): 8 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 2.4 acres, this one is smaller than 65% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.