What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Hapur, Uttar Pradesh

Proposed Group Housing Project "M&M Affinity" at Plot no. GH-03, Block-J, Anand Vihar Awasiya Yojna, Hapur, Uttar Pradesh by M/s M&M Protech Pvt. Ltd.

Proposed Group Housing Project "M&M Affinity" at Plot no. GH-03, Block-J, Anand Vihar Awasiya Yojna, Hapur, Uttar Pradesh by M/s M&M Protech Pvt. Ltd is an approved residential project in Sabri, Hapur, Uttar Pradesh. It plans 74 units in 1 tower of up to 18 floors on 1.2 acres. Its stated project cost is ₹97 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 20 Nov 2026).

See it on the live map All projects in Hapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Group Housing Project "M&M Affinity" at Plot no. GH-03, Block-J, Anand Vihar Awasiya Yojna, Hapur, Uttar Pradesh by M/s M&M Protech Pvt. Ltd is an approved residential project in Sabri, Hapur, Uttar Pradesh. It plans 74 units in 1 tower of up to 18 floors on 1.2 acres.

Who is building it?

The applicant is M & M Protech private limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 20 Nov 2026), as of 27 Nov 2026.

Where is it?

In Sabri, Hapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹97 crore and a site of 1.2 acres.

When was it filed?

The application was filed on 13 May 2026.

Project details

StatusEnvironmental approval granted
Status since20 Nov 2026
Application filed13 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantM & M Protech private limited
UseResidential
Units74
Towers1
Floors (tallest)18
Basements2
Height71 m
Parking spaces172
Land area1.2 acres (0.5 ha)
Built-up area36,205 m² (3,89,707 sq ft)
Plot area4,850 m² (52,205 sq ft)
Project cost₹97 crore
Village / localitySabri
Taluk / tehsilHapur
DistrictHapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04669

In context

17 applications in Hapur since January 2022 are in the same category (Buildings & townships): 8 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.2 acres, this one is smaller than 88% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sabri, Hapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from M & M Protech private limited in Hapur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.