What is "Ordinary Soil Excavation Mining Project"?
"Ordinary Soil Excavation Mining Project" is an approved mining project in Mirpur Sakipur, Sambhal, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Pradeep.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Jul 2024), as of 27 Nov 2026.
Where is it?
In Mirpur Sakipur, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹10 lakh and a site of 3 acres.
When was it filed?
The application was filed on 5 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Jul 2024 |
| Application filed | 5 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pradeep |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Mirpur Sakipur |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01744 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3 acres, this one is smaller than 84% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 11.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Mirpur Sakipur, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos.… — environmental approval granted, 200 m away
- Ordinary Soil Mining — initial checks, 1.2 km away
- Proposed "Ordinary Soil Excavation Mining Project" at Gata No. 337 Mining… — environmental approval granted, 1.4 km away
- Ordinary soil mining at Khasra/Gata Nos. 292, 299mi, 324, 326mi, 328, 288mi,… — environmental approval granted, 1.8 km away
- Proposed "Ordinary Soil Mining Project" at Gata 311/1, 315, 316, 317, 318,… — under environmental review, 2 km away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 204,… — under environmental review, 2 km away
- "Ordinary Soil Mining" Project at Gata No.- 230मि, 311/1, 318, Village-… — more information requested, 2.1 km away
- "Ordinary Soil Mining Project" at Gata No.- 230मि, 312, 270, Village- Shahpur… — more information requested, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.