Quick answers
What is this project?
Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos. 2, 6, 65 and 66 Area – 3.332 ha is an approved mining project in Mshakipur, Sambhal, Uttar Pradesh. The site covers 8.2 acres.
Who is building it?
The applicant is Kamal Sharma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 May 2025), as of 27 Nov 2026.
Where is it?
In Mshakipur, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹18 lakh and a site of 8.2 acres.
When was it filed?
The application was filed on 5 Apr 2025.
Project details
| Official title | Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos. 2, 6, 65 and 66 Area – 3.332 ha at Village- Mirpur Saakipur, Tehsil and District - Sambhal, Uttar Pradesh of M/s Nischay Housing Private Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 28 May 2025 |
| Application filed | 5 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kamal Sharma |
| Land area | 8.2 acres (3.3 ha) |
| Project cost | ₹18 lakh |
| Village / locality | Mshakipur |
| Taluk / tehsil | Sambhal |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03043 |
In context
51 applications in Sambhal since January 2022 are in the same category (Mining): 33 approved, 17 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.2 acres, this one is larger than 75% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 11.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Mshakipur, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Excavation Mining Project" — environmental approval granted, 200 m away
- Ordinary Soil Mining — initial checks, 1.1 km away
- Proposed "Ordinary Soil Excavation Mining Project" at Gata No. 337 Mining… — environmental approval granted, 1.2 km away
- Ordinary soil mining at Khasra/Gata Nos. 292, 299mi, 324, 326mi, 328, 288mi,… — environmental approval granted, 1.6 km away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 204,… — under environmental review, 1.8 km away
- Proposed "Ordinary Soil Mining Project" at Gata 311/1, 315, 316, 317, 318,… — under environmental review, 1.8 km away
- "Ordinary Soil Mining" Project at Gata No.- 230मि, 311/1, 318, Village-… — more information requested, 1.9 km away
- "Ordinary Soil Mining Project" at Gata No.- 230मि, 312, 270, Village- Shahpur… — more information requested, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.