What is Developing? Open the mapMap

Cleared for impact studyMining · Mirzapur, Uttar Pradesh

"Building Stone Sand Stone" Project at Gata No.- 997Mi (Sr. No.- 01) , Village- Sindhora, Tehsil- Sadar, District- Mirzapur, U.P. (Applied Area : 1.82 ha.) M.C.C. Mahadev Construction Pvt. Ltd. Managing Director- Shri Anoop Kumar Singh S/o Shri Dharamjeet Singh

"Building Stone Sand Stone" Project at Gata No.- 997Mi (Sr. No.- 01) , Village- Sindhora, Tehsil- Sadar, District- Mirzapur, U.P. (Applied Area : 1.82 ha.) M.C.C. Mahadev Construction Pvt. Ltd. Managing Director- Shri Anoop Kumar Singh S/o Shri Dharamjeet Singh is a proposed mining project in Sindhora, Mirzapur, Uttar Pradesh. The site covers 4.5 acres. Its stated project cost is ₹71 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Nov 2024).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building Stone Sand Stone" Project at Gata No.- 997Mi (Sr. No.- 01) , Village- Sindhora, Tehsil- Sadar, District- Mirzapur, U.P. (Applied Area : 1.82 ha.) M.C.C. Mahadev Construction Pvt. Ltd. Managing Director- Shri Anoop Kumar Singh S/o Shri Dharamjeet Singh is a proposed mining project in Sindhora, Mirzapur, Uttar Pradesh. The site covers 4.5 acres.

Who is building it?

The applicant is M/S M.C.C. Mahadev Construction PVT. LTD..

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Nov 2024), as of 27 Nov 2026.

Where is it?

In Sindhora, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹71 lakh and a site of 4.5 acres.

When was it filed?

The application was filed on 15 Apr 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: "Building Stone Sand Stone" Project at Gata No.- 997Mi (Sr. No.- 01) , Village-…

Project details

StatusCleared for impact study
Status since5 Nov 2024
Application filed15 Apr 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantM/S M.C.C. Mahadev Construction PVT. LTD.
Land area4.5 acres (1.8 ha)
Project cost₹71 lakh
Village / localitySindhora
Taluk / tehsilMirzapur
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01771

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Sept 2025Environmental approval granted4.5 acres₹71 lakh
Early planning filed 15 Apr 2024 (this page)Cleared for impact study4.5 acres₹71 lakh

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.5 acres, this one is larger than 68% of them.

13 other mining leases have applied within 500 m of this site; together with this one they cover 81.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 21 mining leases have applied within 5 km.

Where it is

Sindhora, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.