Quick answers
What is this project?
"Building Stone Sand Stone" Project at Gata No.- 997Mi (Sr. No.- 01) , Village- Sindhora, Tehsil- Sadar, District- Mirzapur, U.P. (Applied Area : 1.82 ha.) M.C.C. Mahadev Construction Pvt. Ltd. Managing Director- Shri Anoop Kumar Singh S/o Shri Dharamjeet Singh is an approved mining project in Sindhora, Mirzapur, Uttar Pradesh. The site covers 4.5 acres.
Who is building it?
The applicant is M/S M.C.C. Mahadev Construction PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Dec 2025), as of 27 Nov 2026.
Where is it?
In Sindhora, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹71 lakh and a site of 4.5 acres.
When was it filed?
The application was filed on 8 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Dec 2025 |
| Application filed | 8 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S M.C.C. Mahadev Construction PVT. LTD. |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹71 lakh |
| Village / locality | Sindhora |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03421 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Sept 2025 (this page) | Environmental approval granted | 4.5 acres | ₹71 lakh |
| Early planning filed 15 Apr 2024 | Cleared for impact study | 4.5 acres | ₹71 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.5 acres, this one is larger than 68% of them.
13 other mining leases have applied within 500 m of this site; together with this one they cover 81.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 21 mining leases have applied within 5 km.
Where it is
Sindhora, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone Sand Stone" Project at Gata No.- 997Mi (Sr. No.- 01) ,… — cleared for impact study, 0 m away
- "Building Stone Sand Stone" Project at Gata No.- 997Mi, Village- Sindhora,… — environmental approval granted, 100 m away
- "Building Stone Sand Stone" Project at Gata No.- 997Mi, Village- Sindhora,… — cleared for impact study, 100 m away
- "Building stone, Sandstone, Quartizite, Ballast, Gitti", at Gata No.- 997 Mi… — initial checks, 150 m away
- "Building stone, Sandstone, Quartizite, Ballast, Gitti", at Gata No.- 997 Mi… — cleared for impact study, 150 m away
- "Building Stone (Sandstone)" Mine from Village- Sindhora, Gata No.- 997 Mi,… — cleared for impact study, 150 m away
- "Building Stone (Sandstone)" Mine from Village- Sindhora, Gata No.- 997 Mi,… — lapsed, 150 m away
- Sindhora Building stone Sand Stone Mining project — environmental approval granted, 150 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.