Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Dec 2024 |
| Application filed | 27 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manoj Kumar |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Imliyan Manpur |
| Taluk / tehsil | Mahmudabad |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01792 |
In context
55 applications in Sitapur since January 2022 are in the same category (Mining): 39 approved, 16 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.5 acres, this one is smaller than 80% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 3.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Imliyan Manpur, Mahmudabad, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Excavation Project — environmental approval granted, 400 m away
- Proposed"Ordinary Soil Excavation Project"at Gata No.- 270, 271 — returned to applicant, 800 m away
- Environmental clearance of proposed ordinary soil mining at Gata/ Khasra Nos.… — environmental approval granted, 900 m away
- Ordinary Earth Mining Project Gata No.-401, 405, 394 — under environmental review, 1.1 km away
- "Ordinary Soil Excavation Project" at Gata No.- 421, 399, 429 — environmental approval granted, 1.2 km away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 132 and… — under environmental review, 2.6 km away
- Ordinary Earth Mining Project at Gata no. – 132 &133, Village- Jairampur,… — environmental approval granted, 2.7 km away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 478,… — initial checks, 3 km away