Project details
| Official title | "Ordinary Soil Excavation Project" at Gata No.- 421, 399, 429 in Village-Murtaza Nagar, Tehsil- Mahmudabad, District- Sitapur, U.P. (Area – 2.872 ha) for Shri Pankaj Verma S/o Shri Hansraj Verma |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Feb 2026 |
| Application filed | 26 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pankaj Verma |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Murtazanagar |
| Taluk / tehsil | Mahmudabad |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02969 |
In context
55 applications in Sitapur since January 2022 are in the same category (Mining): 39 approved, 16 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.1 acres, this one is smaller than 91% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 6.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Murtazanagar, Mahmudabad, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Earth Mining Project Gata No.-401, 405, 394 — under environmental review, 200 m away
- Environmental clearance of proposed ordinary soil mining at Gata/ Khasra Nos.… — environmental approval granted, 500 m away
- Proposed"Ordinary Soil Excavation Project"at Gata No.- 270, 271 — returned to applicant, 800 m away
- Ordinary Soil Excavation Project — environmental approval granted, 800 m away
- Ordinary Soil Mining Project — environmental approval granted, 1.2 km away
- Lodhaura Wajid Ali Soil Mining Project — environmental approval granted, 2.7 km away
- Lodhaura Wajid Ali Soil Mining Project — initial checks, 2.8 km away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 132 and… — under environmental review, 3.1 km away
More from Pankaj Verma in Sitapur
- Ordinary Earth Mining Project Gata No.-517, 989Aa — returned to applicant
- Ordinary Earth Mining Project Gata No.-401, 405, 394 — under environmental review
- Proposed"Ordinary Soil Excavation Project"at Gata No.- 270, 271 — returned to applicant
- Ordinary Earth Mining Project at Gata no. – 132 &133, Village- Jairampur,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.