Quick answers
What is this project?
Transfer of the EC for the Short Term Lease of Sand/Morum Mining at Betwa River is a proposed mining project in Khamun, Garautha, Jhansi, Uttar Pradesh. The site covers 29.7 acres.
Who is building it?
The applicant is Bihari Lal Pal.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Khamun, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 29.7 acres.
When was it filed?
The application was filed on 27 Nov 2024.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 13 Jul 2026 |
| Application filed | 27 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Bihari Lal Pal |
| Land area | 29.7 acres (12 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Khamun |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01906 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 29.7 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Khamun, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 0 m away
- Tharro Sand/Morrum Mining Project — environmental approval granted, 950 m away
- Tharro Sand/Morrum Mining Project — cleared for impact study, 950 m away
- Sikarivyas Sand/Morrum Mining Project on Betwa River — environmental approval granted, 1.6 km away
- Sikarivyas Sand/Morrum Mining Project on Betwa River — cleared for impact study, 1.6 km away
- Sand/Morrum Mining from Betwa River Bed Mining Project — environmental approval granted, 3.3 km away
- Sand/Morrum Mining from Betwa River Bed Mining Project — cleared for impact study, 3.3 km away
- Sand/Morrum project from Araji No- 522 Gha, River- Betwa, Village- Behtar,… — environmental approval granted, 3.3 km away
More from Bihari Lal Pal in Jhansi
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.