Environmental approval grantedMining · Jhansi, Uttar Pradesh

Sikarivyas Sand/Morrum Mining Project on Betwa River

Sikarivyas Sand/Morrum Mining Project on Betwa River is an approved mining project in Khamun, Garautha, Jhansi, Uttar Pradesh. The site covers 50 acres. Its stated project cost is ₹43 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 11 Sept 2023).

See it on the live map All projects in Jhansi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Sikarivyas Sand/Morrum Mining Project on Betwa River?

Sikarivyas Sand/Morrum Mining Project on Betwa River is an approved mining project in Khamun, Garautha, Jhansi, Uttar Pradesh. The site covers 50 acres.

Who is building it?

The applicant is Sudhir Kumar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 11 Sept 2023), as of 27 Nov 2026.

Where is it?

In Khamun, Garautha, Jhansi, Uttar Pradesh.

How big is it?

It has a stated cost of ₹43 lakh and a site of 50 acres.

When was it filed?

The application was filed on 11 Sept 2023.

Project details

StatusEnvironmental approval granted
Status since11 Sept 2023
Application filed11 Sept 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSudhir Kumar
Land area50 acres (20.2 ha)
Project cost₹43 lakh
Village / localityKhamun
Taluk / tehsilGarautha
DistrictJhansi
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01024

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 11 Sept 2023 (this page)Environmental approval granted50 acres₹43 lakh
Early planning filed 23 Feb 2023Cleared for impact study50 acres₹43 lakh

In context

211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 50 acres, this one is larger than 93% of them.

No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.

Where it is

Khamun, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.