Quick answers
What is this project?
Proposed riverbed sand/morrum mining project from Yamuna River located at Gata No. Part of 96/2 (Khand No. 03), Village- Marka Khadar, Tehsil- Baberu, District- Banda, Uttar-Pradesh. Sanctioned Lease Area- 20.00 ha is an approved mining project in Marka Khadar, Baberu, Banda, Uttar Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Pehalwan Traders (Opc) Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.
Where is it?
In Marka Khadar, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹7.4 crore and a site of 49.4 acres.
When was it filed?
The application was filed on 4 Nov 2024.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed riverbed sand/morrum mining project from Yamuna River located at Gata No. Part…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Feb 2026 |
| Application filed | 4 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pehalwan Traders (Opc) Private Limited |
| Land area | 49.4 acres (20 ha) |
| Project cost | ₹7.4 crore |
| Village / locality | Marka Khadar |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01996 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 18 Feb 2026 | Environmental approval granted | 49.4 acres | ₹7.4 crore |
| New project filed 4 Nov 2024 (this page) | Environmental approval granted | 49.4 acres | ₹7.4 crore |
| Early planning filed 28 Jun 2023 | Cleared for impact study | 49.4 acres | ₹7.4 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is larger than 69% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 148.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Marka Khadar, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed riverbed sand/morrum mining project from Yamuna River located at Gata… — environmental approval granted, 0 m away
- Proposed riverbed sand/morrum mining project from Yamuna River located at Gata… — cleared for impact study, 0 m away
- Sand/Morrum Mine from Riverbed of Yamuna River — cleared for impact study, 450 m away
- Sand/Morrum Mining from Yamuna River Bed mining project — under environmental review, 450 m away
- Sand/Morrum Mine from Riverbed of Yamuna River — environmental approval granted, 450 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of Wengty… — environmental approval granted, 500 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of Wengty… — cleared for impact study, 500 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of S.V.… — environmental approval granted, 950 m away
All 3 Pehalwan Traders (Opc) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.