Quick answers
What is Sand/Morrum Mine from Riverbed of Yamuna River?
Sand/Morrum Mine from Riverbed of Yamuna River is an approved mining project in Marka Khadar, Baberu, Banda, Uttar Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Jitendra Patel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Oct 2024), as of 27 Nov 2026.
Where is it?
In Marka Khadar, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 49.4 acres.
When was it filed?
The application was filed on 3 May 2024.
Project details
| Official title | Sand/Morrum Mine from Riverbed of Yamuna River at Village- Marka Khadar [Gata No.- Part of 96/2, Khand No.- 02, Lease area- 20.0 Ha. (49.42 Acres)] Tehsil- Baberu, District- Banda, State- Uttar Pradesh, Project Proponent- Shri Jitendra Patel |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Oct 2024 |
| Application filed | 3 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jitendra Patel |
| Land area | 49.4 acres (20 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Marka Khadar |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-02267 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 May 2024 (this page) | Environmental approval granted | 49.4 acres | ₹1.1 crore |
| Early planning filed 28 Aug 2023 | Cleared for impact study | 49.4 acres | ₹1.1 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 49.4 acres, this one is larger than 69% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 197.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Marka Khadar, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mine from Riverbed of Yamuna River — cleared for impact study, 0 m away
- Sand/Morrum Mining from Yamuna River Bed mining project — under environmental review, 0 m away
- Proposed riverbed sand/morrum mining project from Yamuna River located at Gata… — environmental approval granted, 450 m away
- Proposed riverbed sand/morrum mining project from Yamuna River located at Gata… — environmental approval granted, 450 m away
- Proposed riverbed sand/morrum mining project from Yamuna River located at Gata… — cleared for impact study, 450 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of S.V.… — environmental approval granted, 500 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of S.V.… — cleared for impact study, 500 m away
- Proposed riverbed sand/morrum mining project from Yamuna River of M/s Pehalwan… — under environmental review, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.