Quick answers
What is this project?
Building stone (Khanda, Boulder, Ballast) Sandstone Mining Project, Lease area-2.023 ha Araji No.515 (Khand No-01) is a proposed mining project in Sirbo, Garautha, Jhansi, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Mayank Gupta.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 May 2025), as of 27 Nov 2026.
Where is it?
In Sirbo, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 5 acres.
When was it filed?
The application was filed on 1 Apr 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Building stone (Khanda, Boulder, Ballast) Sandstone Mining Project, Lease area-2.023 ha…
Project details
| Official title | Building stone (Khanda, Boulder, Ballast) Sandstone Mining Project, Lease area-2.023 ha Araji No.515 (Khand No-01) at Village–Sirbo, Tehsil-Garautha, District-Jhansi, U. P. |
|---|---|
| Status | Cleared for impact study |
| Status since | 29 May 2025 |
| Application filed | 1 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Mayank Gupta |
| Land area | 5 acres (2 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Sirbo |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02006 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Dec 2025 | Environmental approval granted | 5 acres | ₹85 lakh |
| Early planning filed 1 Apr 2024 (this page) | Cleared for impact study | 5 acres | ₹85 lakh |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 58% of them.
11 other mining leases have applied within 500 m of this site; together with this one they cover 52.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 22 mining leases have applied within 5 km.
Where it is
Sirbo, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building stone (Khanda, Boulder, Ballast) Sandstone Mining Project, Lease… — environmental approval granted, 0 m away
- "Building Stone As (Khanda, Boulder, Ballast)" — under environmental review, 150 m away
- Area: 1.618 Ha Khanda- Boulder/ Gitti-Ballast Mining Project At Gata-515,… — environmental approval granted, 150 m away
- Imarati Pathhar- Granite (Khanda Boulder Ballast) Mining in Gata No 515… — environmental approval granted, 150 m away
- Imarati Pathhar- Granite (Khanda Boulder Ballast) Mining in Gata No 515… — cleared for impact study, 150 m away
- "Building Stone(Granite-Khanda Boulder Ballast) Mining Project" in Gata No-515… — environmental approval granted, 150 m away
- "Building Stone(Granite-Khanda Boulder Ballast) Mining Project" in Gata No-515… — cleared for impact study, 150 m away
- "Building Stone As (Khanda, Boulder, Ballast)" Mining Project — under environmental review, 250 m away
More from Mayank Gupta in Jhansi
- Imarati Pathhar- Granite (Khanda Boulder Ballast) Mining in Gata No 515… — environmental approval granted
- Imarati Pathhar- Granite (Khanda Boulder Ballast) Mining in Gata No 515… — cleared for impact study
- Sand/Moram Mining Project at Betwa River Bed, Gata No. 2118, 2119, Khand No.… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.