Quick answers
What is this project?
Area- 1.8210 Ha River Bed Mineral (R.B.M) (Sand/Bajri/Boulder) Mining Project is an approved mining project in Patti Kalan, Suar, Rampur, Uttar Pradesh. The site covers 4.5 acres.
Who is building it?
The applicant is Rajesh Kumar Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Jun 2025), as of 27 Nov 2026.
Where is it?
In Patti Kalan, Suar, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹46 lakh and a site of 4.5 acres.
When was it filed?
The application was filed on 30 Apr 2024.
Project details
| Official title | Area- 1.8210 Ha River Bed Mineral (R.B.M) (Sand/Bajri/Boulder) Mining Project at Gata No- 728 Mi Village- Pattikalan, Tehsil- Suar, District- Rampur Uttar Pradesh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 10 Jun 2025 |
| Application filed | 30 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajesh Kumar Gupta |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹46 lakh |
| Village / locality | Patti Kalan |
| Taluk / tehsil | Suar |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02047 |
In context
9 applications in Rampur since January 2022 are in the same category (Mining): 7 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
3 other mining leases have applied within 500 m of this site; together with this one they cover 12 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Patti Kalan, Suar, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand removal from Bhumidhari/Agricultural land/Private land" at Gata… — lapsed, 250 m away
- "Sand or Bajri or Boulder RBM Mining" from Riverbed of Kosi River — cleared for impact study, 350 m away
- Proposed "R.B.M. Mining" Project at Gata No.- 565, Village- Patti Kalan,… — environmental approval granted, 500 m away
- New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca… — forest land use approved, 5.2 km away
- "Ordinary Sand (Category-II) Mining" from Riverbed of Kosi River — environmental approval granted, 7 km away
- "Ordinary Sand Mining" Project — environmental approval granted, 7.1 km away
- Ordinary Sand Mine — environmental approval granted, 7.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — in-principle approval, conditions pending, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.