Quick answers
What is this project?
"Ordinary Sand (Category-II) Mining" from Riverbed of Kosi River is an approved mining project in Rampur Dhamman, Tanda, Rampur, Uttar Pradesh. The site covers 4.4 acres.
Who is building it?
The applicant is Abdul Salam.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Feb 2026), as of 27 Nov 2026.
Where is it?
In Rampur Dhamman, Tanda, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 4.4 acres.
When was it filed?
The application was filed on 19 Oct 2025.
Project details
| Official title | "Ordinary Sand (Category-II) Mining" from Riverbed of Kosi River at Village- Dundawala Ahatmali, Gata No.- 644 Mi, Lease Area- 3.5870 Ha., Tehsil– Swar, District– Rampur, Uttar Pradesh, Project Proponent- M/s Abdul Salam Contractor (Prop.- Abdul Salam) |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Feb 2026 |
| Application filed | 19 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Abdul Salam |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Rampur Dhamman |
| Taluk / tehsil | Tanda |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03604 |
In context
9 applications in Rampur since January 2022 are in the same category (Mining): 7 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other mining leases have applied within 500 m of this site; together with this one they cover 17.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Rampur Dhamman, Tanda, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" Project — environmental approval granted, 100 m away
- Ordinary Sand Mine — environmental approval granted, 300 m away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 1.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — in-principle approval, conditions pending, 2.4 km away
- New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca… — forest land use approved, 2.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — forest land use approved, 5.1 km away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — environmental approval granted, 5.4 km away
- Expansion of existing Sugar unit from 5,000 TCD to 10,000 TCD — cleared for impact study, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.