Quick answers
What is this project?
"Ordinary Sand Mining" Project at Gata No.- 36Ka, Village- Firozpur Manjha, Tehsil- Sohawal, District- Ayodhya, U.P. (Applied Area : 6.00 ha.) M/s Maa Jawla Traders, Prop.- Shri Vijay Pratap Singh is an approved mining project in Firozpur Manjha, Sohawal, Ayodhya, Uttar Pradesh. The site covers 14.8 acres.
Who is building it?
The applicant is Vijay Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Nov 2024), as of 27 Nov 2026.
Where is it?
In Firozpur Manjha, Sohawal, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹66 lakh and a site of 14.8 acres.
When was it filed?
The application was filed on 31 Mar 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Nov 2024 |
| Application filed | 31 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vijay Singh |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹66 lakh |
| Village / locality | Firozpur Manjha |
| Taluk / tehsil | Sohawal |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02062 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Mar 2024 (this page) | Environmental approval granted | 14.8 acres | ₹66 lakh |
| Early planning filed 25 May 2023 | Cleared for impact study | 14.8 acres | ₹66 lakh |
In context
57 applications in Ayodhya since January 2022 are in the same category (Mining): 42 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 14.8 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Firozpur Manjha, Sohawal, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" Project at Gata No.- 36Ka, Village- Firozpur Manjha,… — cleared for impact study, 0 m away
- "Ordinary Sand Mine" from riverbed of Ghaghra River — environmental approval granted, 600 m away
- Riverbed Sand/ Morrum Mine from riverbed of Ghaghra River at Gata No. 13 Gha,… — environmental approval granted, 1 km away
- Riverbed Sand/ Morrum Mine from riverbed of Ghaghra River at Gata No. 13 Gha,… — cleared for impact study, 1 km away
- "Manjha Kala Ordinary Sand Mine Private Land on Riverbed of Ghaghara River" — environmental approval granted, 1.4 km away
- "Manjha Kala Ordinary Sand Mine Private Land on Riverbed of Ghaghara River" — cleared for impact study, 1.4 km away
- "Ordinary Sand mine" — environmental approval granted, 1.5 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — under environmental review, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.