Quick answers
What is "Ordinary Sand Mining" from Riverbed of Ghaghra River?
"Ordinary Sand Mining" from Riverbed of Ghaghra River is a proposed mining project in Gaura Brahman, Sohawal, Ayodhya, Uttar Pradesh. The site covers 291.2 acres.
Who is building it?
The applicant is Sanjay Yadav.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Gaura Brahman, Sohawal, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹93 lakh and a site of 291.2 acres.
When was it filed?
The application was filed on 1 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: "Ordinary Sand Mining" from Riverbed of Ghaghra River
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Manjha Kala, Gata No.- 135ञ, 149घ, 153न & 19क/13, Lease Area- 1.7860 ha., Tehsil- Sohawal, District- Ayodhya, Uttar Pradesh, Project Proponent- Shri Sanjay Kumar Yadav |
|---|---|
| Status | Under environmental review |
| Status since | 20 Nov 2026 |
| Application filed | 1 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sanjay Yadav |
| Land area | 291.2 acres (117.9 ha) |
| Project cost | ₹93 lakh |
| Village / locality | Gaura Brahman |
| Taluk / tehsil | Sohawal |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03996 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Aug 2026 (this page) | Under environmental review | 291.2 acres | ₹93 lakh |
| Early planning filed 23 Apr 2025 | Cleared for impact study | 291.2 acres | ₹93 lakh |
In context
57 applications in Ayodhya since January 2022 are in the same category (Mining): 42 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 291.2 acres, this one is larger than 93% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 306.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Gaura Brahman, Sohawal, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Ghaghra River — cleared for impact study, 0 m away
- "Ordinary Sand mine" — environmental approval granted, 0 m away
- "Manjha Kala Ordinary Sand Mine Private Land on Riverbed of Ghaghara River" — environmental approval granted, 150 m away
- "Manjha Kala Ordinary Sand Mine Private Land on Riverbed of Ghaghara River" — cleared for impact study, 150 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — more information requested, 450 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 450 m away
- Riverbed Sand/ Morrum Mine from riverbed of Ghaghra River at Gata No. 13 Gha,… — environmental approval granted, 550 m away
- Riverbed Sand/ Morrum Mine from riverbed of Ghaghra River at Gata No. 13 Gha,… — cleared for impact study, 550 m away
More from Sanjay Yadav in Ayodhya
- "Ordinary Sand mine" — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.