Project details
| Official title | Environmental clearance of proposed ordinary Soil mining at Khasra/Gata Nos. 405, Area – 0.4550 ha at Village- Baadi, Tehsil –Sidhauli, District - Sitapur, Uttar Pradesh of Shri Dhirendra Pratap Singh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 6 Nov 2024 |
| Application filed | 2 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dhirendra Pratap Singh |
| Land area | 1.1 acres (0.5 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Bari |
| Taluk / tehsil | Sidhauli |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02095 |
In context
55 applications in Sitapur since January 2022 are in the same category (Mining): 39 approved, 16 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.1 acres, this one is smaller than 89% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 1.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Bari, Sidhauli, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Earth Mining Project — more information requested, 400 m away
- Kaji Kola Sand Mining Project — environmental approval granted, 3.1 km away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 348 mi,… — initial checks, 3.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Manju Eco… — more information requested, 4.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to Property of… — more information requested, 4.4 km away
- Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos.… — environmental approval granted, 4.4 km away
- Jallabad Soil Mining Project — environmental approval granted, 4.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Janta Dhaba of… — lapsed, 4.5 km away
More from Dhirendra Pratap Singh in Sitapur
- Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos.… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.