Project details
| Official title | Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos. 620 Mi and 536 Ga, Area – 0.5190 ha at Village- Jallabad, Tehsil –Sidhauli, District - Sitapur, Uttar Pradesh of Shri Dhirendra Pratap Singh. |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 May 2025 |
| Application filed | 4 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dhirendra Pratap Singh |
| Land area | 1.3 acres (0.5 ha) |
| Project cost | ₹13 lakh |
| Village / locality | Jallabad |
| Taluk / tehsil | Sidhauli |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02988 |
In context
55 applications in Sitapur since January 2022 are in the same category (Mining): 39 approved, 16 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.3 acres, this one is smaller than 87% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 3.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Jallabad, Sidhauli, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jallabad Soil Mining Project — environmental approval granted, 200 m away
- Environmental clearance of proposed ordinary soil mining at Khasra/Gata Nos.… — environmental approval granted, 650 m away
- Kaji Kola Sand Mining Project — environmental approval granted, 1.4 km away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 348 mi,… — initial checks, 1.7 km away
- Ordinary Earth Mining Project — environmental approval granted, 3.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to Property of… — more information requested, 3.3 km away
- Environmental clearance of proposed ordinary Soil mining at Khasra/Gata Nos.… — environmental approval granted, 4.4 km away
- Ordinary Earth Mining Project — more information requested, 4.6 km away
More from Dhirendra Pratap Singh in Sitapur
- Environmental clearance of proposed ordinary Soil mining at Khasra/Gata Nos.… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.