Quick answers
What is this project?
100 Bedded District Hospital Building in Headquarter Bahjoe, Tehsil- Chandausi, District-Sambhal, Uttar Pradesh by Chief Medical Officer(CMO), Sambhal District Hospital is an approved hospital project in Bahjoi, Chandausi, Sambhal, Uttar Pradesh. It plans 100 units in 10 towers of up to 3 floors on 6.4 acres.
Who is building it?
The applicant is Tarannum Raza.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Oct 2024), as of 27 Nov 2026.
Where is it?
In Bahjoi, Chandausi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹133.9 crore and a site of 6.4 acres.
When was it filed?
The application was filed on 9 Aug 2024.
Project details
| Official title | Construction of 100 Bedded District Hospital Building in Headquarter Bahjoe, Tehsil- Chandausi, District-Sambhal, Uttar Pradesh by Chief Medical Officer(CMO), Sambhal District Hospital |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Oct 2024 |
| Application filed | 9 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Tarannum Raza |
| Use | Hospital |
| Units | 100 |
| Towers | 10 |
| Floors (tallest) | 3 |
| Parking spaces | 75 |
| Land area | 6.4 acres (2.6 ha) |
| Built-up area | 20,753 m² (2,23,383 sq ft) |
| Plot area | 25,842 m² (2,78,161 sq ft) |
| Project cost | ₹133.9 crore |
| Village / locality | Bahjoi |
| Taluk / tehsil | Chandausi |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02153 |
In context
6 applications in Sambhal since January 2022 are in the same category (Buildings & townships): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bahjoi, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land to be Diverted for Construction of Nala at… — lapsed, 1.5 km away
- Police Line (Residential & Non-Residential) Project — environmental approval granted, 5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit Approach to… — forest land use approved, 5.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — more information requested, 5.6 km away
- Retail Outlet MS/HSD Petrol/Diesel Pump HPCL Ltd. Meerut. Protected land is… — forest land use approved, 5.9 km away
- Ordinary Earth excavation from Khasra/Gata Nos 56, 103, 149, 298, 300, 304,… — environmental approval granted, 5.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to Residential… — lapsed, 6.6 km away
- Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — in-principle approval, conditions pending, 6.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.