Quick answers
What is this project?
Retail Outlet MS/HSD Petrol/Diesel Pump HPCL Ltd. Meerut. Protected land is required to be diverted (FCA 1980 for no forestry purposes) Site is an approved fuel station in Mirzapur Aktra, Chandausi, Sambhal, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 10 Jul 2024), as of 27 Nov 2026.
Where is it?
In Mirzapur Aktra, Chandausi, Sambhal, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.8 acres and 2,020 m² of forest land.
When was it filed?
The application was filed on 10 Feb 2023.
Project details
| Official title | Construction of Retail Outlet MS/HSD Petrol/Diesel Pump HPCL Ltd. Meerut. Protected land is required to be diverted (FCA 1980 for no forestry purposes) Site at Village Mirzapur Akhtara Khasra/ Gata No.721 ( Before ChaKbandi 251/2) along Badaun-Bilsi- Islam Nagar-Bijnor Road (Sambhal-Behjoi Road) (SH-51) in Km. Stone74 CH-73.810 to73.845 (RHS) Tehsil Chandausi District Sambhal (U.P.) |
|---|---|
| Status | Forest land use approved |
| Status since | 10 Jul 2024 |
| Application filed | 10 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3,200 m² |
| Forest land | 2,020 m² |
| Project cost | ₹60 lakh |
| Village / locality | Mirzapur Aktra |
| Taluk / tehsil | Chandausi |
| District | Sambhal |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06347 |
In context
26 applications in Sambhal since January 2022 are in the same category (Fuel stations): 15 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.8 acres, this one is smaller than 62% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mirzapur Aktra, Chandausi, Sambhal, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — more information requested, 250 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit Approach to… — forest land use approved, 350 m away
- Police Line (Residential & Non-Residential) Project — environmental approval granted, 4.7 km away
- Re-diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 4.8 km away
- Re-diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 4.8 km away
- 100 Bedded District Hospital Building in Headquarter Bahjoe, Tehsil-… — environmental approval granted, 5.9 km away
- Protected Forest Land to be Diverted for Construction of Nala at… — lapsed, 6.2 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 6.4 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Sambhal
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
6 Hindustan Petroleum Corporation (HPCL) projects in Sambhal
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.