Quick answers
What is this project?
"Building Stone Sand Stone" Project at Gata No.- 786 & 787, Village- Chandlewa Kalan, Tehsil- Sadar, District- Mirzapur, U.P. (Applied Area : 1.210 ha.) Prop.- Smt. Sushama Mishra W/o Shri Rajesh Mishra is an approved mining project in Chandlewan Kalan, Mirzapur, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Sushama Mishra.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Nov 2024), as of 27 Nov 2026.
Where is it?
In Chandlewan Kalan, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹70 lakh and a site of 3 acres.
When was it filed?
The application was filed on 4 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Nov 2024 |
| Application filed | 4 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sushama Mishra |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Chandlewan Kalan |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02170 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3 acres, this one is larger than 51% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Chandlewan Kalan, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Area 0.809 ha Building stone (Sandstone) Mining project — environmental approval granted, 1.1 km away
- Area 0.809 ha Building stone (Sandstone) Mining project — under environmental review, 1.1 km away
- Chandlevakalan Building Stone (Sand Stone) Mining project — environmental approval granted, 1.1 km away
- Proposed Forest Land to be Diverted for Construction of road — in-principle approval, conditions pending, 2.3 km away
- BKPL Hinauti (Tap off point on Ex .BKPL To Proposed IOCL Terminal ) — lapsed, 3.5 km away
- Proposed Project of "Building Stone (Sand stone) Mining" located at Gata No.… — environmental approval granted, 3.8 km away
- Building Stone (Sand Stone) Mine — environmental approval granted, 4.2 km away
- "Building Stone (Sand stone) Mining Project" — environmental approval granted, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.