Proposed Project of "Building Stone (Sand stone) Mining" located at Gata No. 227 Mi & 225 Mi Mining Lease Area 1.012 Ha, Village- Dulhadaul, Tehsil- Chunar, District Mirzapur, Uttar Pradesh.PROP. -SHRI RAJ BAHADUR SINGH is an approved mining project in Dulhadaul, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Raj Bahadur Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Jun 2025), as of 27 Nov 2026.
Where is it?
In Dulhadaul, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹48 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 17 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Jun 2025 |
| Application filed | 17 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Raj Bahadur Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹48 lakh |
| Village / locality | Dulhadaul |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03334 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.
No other mining lease on record is within 500 m of this site; 21 have applied within 5 km.
Where it is
Dulhadaul, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Construction of road — in-principle approval, conditions pending, 1.6 km away
- BKPL Hinauti (Tap off point on Ex .BKPL To Proposed IOCL Terminal ) — lapsed, 2.7 km away
- Building Stone (Sandstone) Mine — environmental approval granted, 3.4 km away
- Building Stone (Sandstone) Mine — cleared for impact study, 3.4 km away
- Madpha Building stone Sand Stone Mining project — cleared for impact study, 3.6 km away
- Madpha Building stone Sand Stone Mining project — environmental approval granted, 3.6 km away
- Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No.… — returned to applicant, 3.8 km away
- Proposed Project of Building stone Sand Stone Mine at Gata No 187 Mi, Sl. No.… — cleared for impact study, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.