Project details
| Official title | Development of Hard boiled Confectionery, Fruit based Jellies, Namkin, Snacks and Cold Storage, Greater Noida, UP |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Jun 2025 |
| Application filed | 9 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Primera Infra Greens Limited |
| Use | Industrial |
| Floors (tallest) | 2 |
| Basements | 1 |
| Height | 15 m |
| Parking spaces | 324 |
| Land area | 4.9 acres (2 ha) |
| Built-up area | 29,969 m² (3,22,583 sq ft) |
| Plot area | 20,000 m² (2,15,278 sq ft) |
| Project cost | ₹73.2 crore |
| Village / locality | Khanpur |
| Taluk / tehsil | Gautam Buddha Nagar |
| District | Gautam Buddha Nagar (Noida) |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02245 |
In context
430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.9 acres, this one is smaller than 73% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khanpur, Gautam Buddha Nagar, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Refrigerator Manufacturing Plant by M/s Dixon Technologies India… — environmental approval granted, 550 m away
- Facility for Manufacturing of Hard-boiled candies, Fruit Based Jellies, Rose… — environmental approval granted, 800 m away
- Proposed Industrial Building at Plot No. 1C/A, Ecotech-6, Greater Noida,… — environmental approval granted, 1.2 km away
- Residential and Non-Residential buildings of 49th Battalion PAC at Ecotech – 7… — environmental approval granted, 1.6 km away
- Industrial Building Project — environmental approval granted, 2.5 km away
- Expansion of Electronic Components (PBA) Manufacturing Unit located at Plot… — initial checks, 2.6 km away
- Re-diversion of forest land for Jio Digital Fibre Private Limited Project for… — lapsed, 2.8 km away
- Industrial Building Project by M/s Fair Export (India) Pvt Ltd — environmental approval granted, 3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.