What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Gautam Buddha Nagar, Uttar Pradesh

Proposed Industrial Building at Plot No. 1C/A, Ecotech-6, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh

Proposed Industrial Building at Plot No. 1C/A, Ecotech-6, Greater Noida, Gautam Buddha Nagar, Uttar Pradesh is an approved industrial building project in Kasna, Gautam Buddha Nagar, Noida, Uttar Pradesh. It plans 1 tower of up to 1 floors on 44.4 acres. Its stated project cost is ₹203.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Nov 2025).

See it on the live map All projects in Gautam Buddha Nagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since10 Nov 2025
Application filed6 Aug 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantOppo Mobiles India Private Limited
UseIndustrial
Towers1
Floors (tallest)1
Height10 m
Parking spaces539
Land area44.4 acres (18 ha)
Built-up area46,148 m² (4,96,732 sq ft)
Plot area1,79,495 m² (19,32,066 sq ft)
Project cost₹203.1 crore
Village / localityKasna
Taluk / tehsilGautam Buddha Nagar
DistrictGautam Buddha Nagar (Noida)
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-02590

In context

430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 44.4 acres, this one is larger than 85% of them.

31 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kasna, Gautam Buddha Nagar, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.