Quick answers
What is this project?
New District Jail (Capacity 1026) at Rasaina, District- Jaunpur, Uttar Pradesh by Superintendent of District Jail, Jaunpur is an approved building project in Indaria, Jaunpur, Uttar Pradesh. It plans 1,026 units of up to 7 floors on 58.5 acres.
Who is building it?
The applicant is Dharmendra Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Jul 2024), as of 27 Nov 2026.
Where is it?
In Indaria, Jaunpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹179.8 crore and a site of 58.5 acres.
When was it filed?
The application was filed on 16 May 2024.
Project details
| Official title | Construction of New District Jail (Capacity 1026) at Rasaina, District- Jaunpur, Uttar Pradesh by Superintendent of District Jail, Jaunpur |
|---|---|
| Status | Environmental approval granted |
| Status since | 3 Jul 2024 |
| Application filed | 16 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Dharmendra Singh |
| Use | Other |
| Units | 1,026 |
| Floors (tallest) | 7 |
| Height | 23 m |
| Parking spaces | 195 |
| Land area | 58.5 acres (23.7 ha) |
| Built-up area | 37,683 m² (4,05,616 sq ft) |
| Plot area | 2,36,911 m² (25,50,086 sq ft) |
| Project cost | ₹179.8 crore |
| Village / locality | Indaria |
| Taluk / tehsil | Jaunpur |
| District | Jaunpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02259 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Indaria, Jaunpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Construction of 4 Lane Railway Over… — forest land use approved, 4.6 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested, 4.8 km away
- Proposed Forest Land to Be Diverted for Construction of Rob — forest land use approved, 5.8 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 8.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 9.3 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — forest land use approved, 11.1 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 11.1 km away
- Forest land proposed to be diverted construction Over Bridge at NH-135A… — lapsed, 11.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.