Quick answers
What is this project?
Forest land proposed to be diverted construction Over Bridge at NH-135A Section Janghai-Jafrabad Railway Track from 28.7 Km to 28.8 Km, Total Length 60M, District- Jaunpur is a lapsed road project in Makhdumpur, Mariahu, Jaunpur, Uttar Pradesh. The site covers 54.7 acres.
Who is building it?
The applicant is NH Division No 1, Pwd Varanasi.
Has it been approved?
No. The application was lapsed on 6 Mar 2026, so it is no longer under consideration.
Where is it?
In Makhdumpur, Mariahu, Jaunpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹400.6 crore; a site of 54.7 acres and 1,800 m² of forest land.
When was it filed?
The application was filed on 9 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Mar 2026 |
| Application filed | 9 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | NH Division No 1, Pwd Varanasi |
| Land area | 54.7 acres (22.1 ha) |
| Forest land | 1,800 m² |
| Project cost | ₹400.6 crore |
| Village / locality | Makhdumpur |
| Taluk / tehsil | Mariahu |
| District | Jaunpur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-05763 |
In context
14 applications in Jaunpur since January 2022 are in the same category (Roads & highways): 7 approved, 1 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 54.7 acres, this one is larger than 71% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Makhdumpur, Mariahu, Jaunpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 2.3 km away
- New District Jail (Capacity 1026) at Rasaina, District- Jaunpur, Uttar Pradesh… — environmental approval granted, 11.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 15.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested, 15.8 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested, 15.8 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 15.9 km away
- Proposed forest land to be diverted for Construction of 4 Lane Railway Over… — forest land use approved, 16.1 km away
- Proposed Forest Land to Be Diverted for Construction of Rob — forest land use approved, 16.7 km away