Quick answers
What is this project?
"Ordinary Soil Excavation Mining" Project at Gata No.- 43, Village- Hadha, Tehsil- Unnao, District- Unnao, Uttar Pradesh. (Area-0.777 Ha) is an approved mining project in Hadha, Unnao, Uttar Pradesh. The site covers 1.9 acres.
Who is building it?
The applicant is Jitendra Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Nov 2024), as of 27 Nov 2026.
Where is it?
In Hadha, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹11 lakh and a site of 1.9 acres.
When was it filed?
The application was filed on 31 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Nov 2024 |
| Application filed | 31 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jitendra Kumar |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹11 lakh |
| Village / locality | Hadha |
| Taluk / tehsil | Unnao |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02280 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.9 acres, this one is smaller than 73% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Hadha, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance of mining permit for simple soil excavation form Gata… — environmental approval granted, 1000 m away
- Last Mile Connecting of GAIL RR-51 Station to M/s Green Gas Limited Station — lapsed, 1.9 km away
- Ordinary Soil Mine — under environmental review, 3.1 km away
- Ordinary Soil Mine — under environmental review, 4.4 km away
- Ordinary Soil Excavation Project — environmental approval granted, 6.5 km away
- Habib Fashion (Unit-Ii) — lapsed, 7.3 km away
- Ordinary Earth Mining Project (Gata No.-378, 359 Village:Bhainsai Naubasta,… — under environmental review, 7.4 km away
- "Ordinary Soil Mining Project" at Gata 378 & 363 — environmental approval granted, 7.5 km away
More from Jitendra Kumar in Unnao
- "Ordinary Soil Excavation Project" at Gata No.- 918Kha, 921Ka, Village-… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.