Quick answers
What is this project?
"Ordinary Soil Excavation Project" at Gata No.- 918Kha, 921Ka, Village- Himmatgarh, Tehsil- Hasanganj, District- Unnao, U.P. (Area – 1.075 ha) is an approved mining project in Himmatgarh, Hasanganj, Unnao, Uttar Pradesh. The site covers 1.5 acres.
Who is building it?
The applicant is Jitendra Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Jan 2023), as of 27 Nov 2026.
Where is it?
In Himmatgarh, Hasanganj, Unnao, Uttar Pradesh.
How big is it?
It has a stated cost of ₹12 lakh and a site of 1.5 acres.
When was it filed?
The application was filed on 27 Jan 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Jan 2023 |
| Application filed | 27 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jitendra Kumar |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Himmatgarh |
| Taluk / tehsil | Hasanganj |
| District | Unnao |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00370 |
In context
72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.5 acres, this one is smaller than 83% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Himmatgarh, Hasanganj, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Earth Mining Project" — environmental approval granted, 2.7 km away
- Proposed Forest Fand to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 3.1 km away
- Academic and hostel blocks at Chandigarh University campus — environmental approval granted, 3.1 km away
- Academic and hostel blocks at Chandigarh University campus — cleared for impact study, 3.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to Private… — in-principle approval, conditions pending, 3.1 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 3.2 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 3.9 km away
- Proposed Logistics Park on Khasra Nos. 212 to 218, 220-C, 220-D, 220-E, 221 to… — under environmental review, 4 km away
More from Jitendra Kumar in Unnao
- "Ordinary Soil Excavation Mining" Project at Gata No.- 43, Village- Hadha,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.