Quick answers
What is this project?
"no Increase in Pollution Load" for Addition of Alternative Feedstock As Grain by the Distillery Unit of M/S Bindals Papers Mills Limited is a proposed industrial project in Adampur Kakwara, Chandpur, Bijnor, Uttar Pradesh. The site covers 32 acres.
Who is building it?
The applicant is Bindals Papers Mills Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Adampur Kakwara, Chandpur, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹569.5 crore and a site of 32 acres.
When was it filed?
The application was filed on 9 Sept 2024.
Project details
| Official title | "no Increase in Pollution Load" for Addition of Alternative Feedstock As Grain Along With Molasses / Sugar Syrup Without Change in Production Capacity I.E. 150 Kld by the Distillery Unit of M/S Bindals Papers Mills Limited |
|---|---|
| Status | Initial checks |
| Status since | 9 Sept 2024 |
| Application filed | 9 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Bindals Papers Mills Limited |
| Land area | 32 acres (12.9 ha) |
| Project cost | ₹569.5 crore |
| Village / locality | Adampur Kakwara |
| Taluk / tehsil | Chandpur |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02301 |
In context
8 applications in Bijnor since January 2022 are in the same category (Industry): 5 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Adampur Kakwara, Chandpur, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land Proposed For Construction Of 2x16M Span Short… — forest land use approved, 6 km away
- Soil Mine Project, Village- Khanpur Raidas. , Tehsil - Chandpur,District-… — under environmental review, 8.2 km away
- Amended BharatNet Project (Noorpur-Chandpur-Bijnor) — lapsed, 9 km away
- Proposed Protected Forest Land to Be Diverted (Forest Conservation Act 1980… — more information requested, 9.2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — more information requested, 10.2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 10.2 km away
- Proposed Expansion of Sugar Mill Cane Crushing Capacity From 10000 Tcd to… — environmental approval granted, 16.9 km away
- Proposed Forest Land to be diverted for 4 Lane Widening and Strengthening of… — more information requested, 17.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.